KFC Fast Food Restaurant, Cookstown
![](http://www.msmcontracts.co.uk/wp-content/uploads/2015/05/MSM-Contracts-Ltd-KFC-Cookstown-1-1024x683.jpg)
![](http://www.msmcontracts.co.uk/wp-content/uploads/2015/05/MSM-Contracts-Ltd-KFC-Cookstown-2-1024x683.jpg)
![](http://www.msmcontracts.co.uk/wp-content/uploads/2015/05/MSM-Contracts-Ltd-KFC-Cookstown-3-1024x637.jpg)
![](http://www.msmcontracts.co.uk/wp-content/uploads/2015/05/MSM-Contracts-Ltd-KFC-Cookstown-4-1024x715.jpg)
![](http://www.msmcontracts.co.uk/wp-content/uploads/2015/05/MSM-Contracts-Ltd-KFC-Cookstown-5-1024x638.jpg)
![](http://www.msmcontracts.co.uk/wp-content/uploads/2015/05/MSM-Contracts-Ltd-KFC-Cookstown-6-1024x622.jpg)
![](http://www.msmcontracts.co.uk/wp-content/uploads/2015/05/MSM-Contracts-Ltd-KFC-Cookstown-7-1024x552.jpg)
CLIENT
Herbel (Eastern)
DURATION
4 months
VALUE RANGE
Below £1m
LOCATION
Killymoon Street, Cookstown, Co Tyrone
DESIGN TEAM
Architect: Coogan & Co Architects
Structural Engineer: Barr Consulting (NI)
M&E Engineer: n/a
Quantity Surveyor: Terry Doherty Partnership
MSM were awarded this fast-track project to construct a new single-storey KFC fast-food restaurant and covered drive-thru, adjacent to a busy junction in Cookstown town centre. The works were successfully delivered within a 15-week programme and required effective co-ordination with specialist fit-out contractors who completed their work packages concurrently. Project handover was ahead of schedule, enabling KFC to commence trading before the Christmas period.
The KFC outlet is located on a former car dealership site and the existing commercial unit (33m x 16m) was demolished during the site clearance works. The steel-frame building is constructed on reinforced concrete pad & strip foundations with masonry cavity infill walling. The building envelope comprises Kingspan Microrib cladding, a cladded feature fin wall with KFC branding, coloured render to blockwork walls, ppc aluminium curtain walling including entrance doors and Trocal coverings to flat roofs including the drive-thru.
External works involved erection of totem signage; forming new asphalt and bitmac paved areas, including roadmarkings, to car park areas and the drive-thru; perimeter fencing; railings; drainage works and services connections.