Residential

Ballyhenry Manor, Comber

Ballyhenry Manor Featured

Client

Rosemount Homes

Duration

30 Months

project value range

>£6m

location

Moorefield Avenue, Comber

Design team:

architect

Alan Bennett Architects

Structural

civil

WSC Consulting

M&E Services

Quantity Surveyor

Giffen Hughes

Procurement Route

Traditional

Role of MSM Contracts

Main Contractor

Construction works commenced in January 2017 to construct a major residential development, Ballyhenry Manor, for Rosemount Homes on an extensive greenfield site on the outskirts of Comber, Co Down.

The two-storey dwellings are designed in a range of 3-bed and 4-bed detached and semi-detached house types. Each dwelling is traditionally constructed with either facing brickwork or blockwork render and completed to a high quality specification.

Phase 1 comprised 9nr units in total – 3nr 4-bed detached dwellings and 6nr 3-bed semi-detached dwellings.

Phase 2 comprised 13nr units in total – 10nr 4-bed detached dwellings; 1nr 3-bed detached dwelling and 2nr 3-bed semi-detached dwellings.

Phase 3 comprised 12nr units in total – 2nr 4-bed detached dwellings and 10nr 3-bed semi-detached dwellings.

Phase 4 comprised 12nr units in total – 2nr 4-bed detached dwellings and 10nr 3-bed semi-detached dwellings.

Phase 5 comprised 9nr units in total – 1nr 4-bed detached dwellings and 8nr 3-bed semi-detached dwellings.

Siteworks have included an extensive cut & fill earthmoving operation, installation of main drainage lines, incoming utility services/connections and construction of access roads & footpaths.

view more Projects