Hospitality

Hampton by Hilton Hotel

Hampton By Hilton Featured

Client

Andras House

Duration

22 Months

project value range

£10m – £11m

location

Hope Street, Belfast

Design team:

architect

Todd Architects

Structural

B W Murray

civil

M&E Services

Caldwell Consulting

Quantity Surveyor

Johnston Houston

Procurement Route

Traditional

Role of MSM Contracts

Main Contractor

This project involved the newbuild construction of a mid-range 178-bed hotel under the Hampton by Hilton brand and is the first hotel under this brand to open on the island of Ireland.

The hotel is constructed over 9nr floors plus plant rooms at roof level. The ground floor includes the hotel lobby and reception; bar and dining areas; a meeting room and workspace; washrooms; breakfast servery; kitchen; offices; stores and plant rooms. Guestrooms are located on floor levels 1 – 8 with a gym and staff accommodation located at level 1.

Construction works were carried on a cleared brownfield site with restricted access and adjacent high-rise buildings. The building is a reinforced concrete frame on a CFA piled 900mm thick reinforced concrete floor slab. The building envelope combines facing brickwork with a self-coloured render to blockwork infill walling, PPC aluminium curtain walling & windows and standing seam cladding to window projections.

An extensive internal fit-out, as per the Hampton by Hilton brand specification, was completed throughout the hotel including the ground floor and the guestrooms to the upper floor levels.