Hospitality

The Loft at Ten Square Hotel

Client

Loughview Leisure Group

Duration

5 Months

project value range

Below £1m

location

Ten Square Hotel, Donegal Square South, Belfast

Design team:

architect

Coogan & Co

Structural

BCD Partnership

civil

M&E Services

FM Stewart & Assoc.

Quantity Surveyor

Bruce Shaw LLP

Procurement Route

Negotiated

Role of MSM Contracts

Main Contractor

MSM Contracts were main contractor on this refurbishment project and we worked in close partnership with the hotel management and design team to    successfully deliver this 5-month project at eighth floor level. These works were carried out as part of the redevelopment of the former 8-storey Lancashire House office building providing extended hotel accommodation for the adjacent Ten Square Hotel and similarly, involving MSM as the main contractor.

Construction works involved:

– Major demolitions and internal strip out to the eighth floor of the former office building

– Extending 2nr lift shafts to serve the eighth floor including alterations to the lift equipment

– Extending the stairwell vertically by one floor

– Constructing vertical extensions above existing roof level to accommodate the extended lift shafts and stairwell

– Alterations to the external building envelope including balcony terrace

– Internal shell fit-out works

– Co-ordinating specialist bar fit-out works with client appointed subcontractors

– Planning and executing works to have minimal impact to the occupied hotel guestrooms on the floors below

The eighth floor level lounge provides luxury bar areas with views over the Belfast city-centre skyline, dining areas with a breakfast servery, lift and stairwell lobby, washrooms, a fully equipped catering kitchen and a balcony terrace.